Underground Space

(TUNNELLING AND DEEP EXCAVATION)

Screen Shot 2016-05-18 at 7.45.33 PM

Screen Shot 2016-05-18 at 7.45.50 PM

Screen Shot 2016-05-18 at 7.46.02 PM

  • Singapore Thomson Line Contract T203 - Construction of Woodlands MRT Station and Cut and Cover Tunnels for Thomson Line

Qualified Person (Design) Geotechnical Services for the project which includes design and construction for the temporary works for the construction of the TSL Woodlands Interchange Station and cut and cover tunnels.

  • Singapore Thomson Line Contract T213 – Construction of Caldecott MRT Station and Tunnels for Thomson Line

Qualified Person (Design) Geotechnical Services for the project which includes design and construction of the temporary works for the construction of the TSL Caldecott Station and a stretch of large diameter mined tunnels as temporary works for the construction of the siding tunnels

  • Singapore Thomson Line Contract T219 – Construction of Orchard MRT Station

Qualified Person (Geotechnical) (Design)

  • Singapore Thomson Line Contract T220 – Construction of Great World Station and Its Associated Tunnels

Qualified Person (Civil & Geotechnical) (Supervision)

  • Singapore Thomson Line Contract T221 – Construction of Havelock MRT Station

Qualified Person (Civil & Geotechnical) (Supervision)

Screen Shot 2016-05-18 at 9.34.50 PM

Screen Shot 2016-05-18 at 9.35.44 PM

  • Project Mass Rapid Transit (MRT) Lembah Kelang Jajaran Sungai Buloh – Kajang, Malaysia
    Underground Works (Tunnels, Stations & Associated Structures) Between Semantan North Portal and Maluri South Portal (UG1)

Contractor’s Independent Checking Engineer (Accredited Checker) for Design of deep excavation (for 3 MRT Stations), temporary earth retaining structures, tunnel-pile interaction

  • Singapore Downtown Line Stage 3 – Bendemeer MRT Station

Qualified Person (Supervision) for the S$215 Million project consisting of a station, shafts and bored tunnels. Total of 4 Nos. of TBM were used to bore through the tunnels with total length of 4.54km

  • Singapore Downtown Line Stage 3 – 5 Stations and Associated Tunnels from Bedok to Tampines

Qualified Person (Geotechnical) for the geotechnical design of the DTL3 5 stations and tunnels

  • Singapore Downtown Line 3 – Tai Seng Facility Building

Professional Engineer (Geotechnical) for LTA – Design, Construction and Completion of Tai Seng Facility Building, responsible for the design and construction of the temporary earth retaining structures and geotechnical aspects of the design and construction of the underground structure

  • Singapore Downtown Line Stage 1 – Promenade MRT Station

Qualified Person (Supervision) for the S$231 Million project consisting of station, shafts and bored tunnels

  • Contract 8288 – Tanglin Halt Outlet Drain at North Buona Vista -Independent Checker for TERS-Mined Tunnel

Impact assessment to adjacent Buona Vista MRT and underground tunnel (CCL)

  • Contract ER382 – New Road Between Macritchie Viaduct and Adam Flyover

Qualified Person (Design) Geotechnical Services