Infrastructure Works

  • Marina East Desalination Plant

 

 

  • Floating PV Test-Bed at Tengeh Reservoir (Phase 1)

Planning, Prelimenary Design, Tender Design and Construction Stage Supervision for Public Utility Board (PUB) & Solar Energy Research Institute Singapore

Phase 1 of Floating Solar PV Test-Bed at Tengeh Reservoir

floating-solar-pv-at-tengeh-reservoir-2016-10-27-at-11-19-50

floating-solar-pv-at-tengeh-reservoir-2016-10-27-at-11-19-50-1

floating-solar-pv-at-tengeh-reservoir-2016-10-27-at-11-19-49

 

(DRAINAGE, SEWERAGE AND WATER PIPE)

  • Improvement to Tanglin Halt Outlet Drain Contract 3

Qualified Person (Civil and Geotechnical) for all temporary excavation works (ERSS / GBW) and alternative design for the conversion of original box drain to new scheme of box drain with diaphragm wall

  • Improvement to Alexandra Canal Subsidiary Drain “F” (Between Tiong Bahru Road and Havelock Road)

Qualified Person (Civil and Geotechnical) for all temporary excavation works (ERSS / GBW), temporary sewer diversions, alternative proposal to replace jack-in piles and culvert crossing TSL tunnel to bored piles and alternative proposal to change jack-in piles to soil replacement to all U-drains

  • Improvement to Bukit Timah Canal near Maple Avenue

Design of temporary earth retaining structures, services steel bridges and flood gate, and QECP services

  • Improvement to Sungei Pandan Kechil (West Coast Road to the Sea)

Qualified Person (Civil and Geotechnical) for design of temporary earth retaining structures and flood gate, and QECP services

Screen Shot 2016-05-18 at 10.46.11 PM

  • Contract T2145: Sewer Diversion Works (Package D)

Qualified Person for Earth Retaining Stabilizing Structure (ERSS)

  • Proposed Sewers in Bedok Reservoir and Changi Business Park Areas

Design of sewer pipe jacking, temporary caissons and earth retaining structures

  • ER296 – Construction and Completion of Sentosa Gateway Tunnel from Telok Blangah Road to Keppel Road / Kampong Bahru Road / Lower Delta Road and Associated Road Widening Work along Lower Delta Road

Qualified Person for Earth Retaining Stabilizing Structure (ERSS)

  • Sewer Extension to Serve North Coast Area – Contract 3

Design of sewer pipe jacking, temporary caissons and earth retaining structures

  • Proposed Sewers in International Road Area

Qualified Person for Earth Retaining Stabilizing Structure (ERSS)

  • Proposed Sewers in Marina Central Area – Contract 1

Design of sewer pipe jacking, temporary caissons and earth retaining structures

  • Supply, Laying and Installation of 1200mm Diameter Potable Water Pipeline along Woodleigh Lane and Proposed New Upper Aljunied Road to Joo Seng Road

Design of jacking/receiving shaft and earth retaining structures

  • Construction of Roads, Drains, Sewers and Ancillary Works at Seletar Aero Drive

Design of sewer pipe jacking, temporary caissons and earth retaining structures

  • Roads and Infrastructure Works at Tampines N6 C1A/1B

Qualified Person for Excavation Works for the Permanent Slope with Height of more than 6m

  • Contract ER458 – Widening of Tanah Merah Coast Road

Structural Capacity check and hydraulic calculation